Town Hall

DCIM\100MEDIA

The Connecticut Department of Transportation is announcing that the Seawall replacement project on Route 146 (Limewood Avenue) between Sybil Avenue and Crouch Road in the Town of Branford will begin on September 8, 2020.

The project consists of replacement of the existing wall, roadway reconstruction, drainage improvement and pedestrian safety improvements to the Indian Neck Trail.

DOT Project No. 0014-0186 was awarded to C.J. Fucci, Inc. at a cost of $5,824,577.40 and is scheduled to be completed on May 31, 2021.  This project is administered by the Office of Construction, District 3 in New Haven.

Lane Closure Info:

Route 146 – Limewood Avenue

Motorists can expect alternating one way traffic through the use of temporary traffic signals to be in place for the duration of the project, for the period from on or about September 10, 2020 to May 1, 2021.

Wilford Road at Rout 146

Southern Leg of Wilford Road at Route 146 will be closed, and traffic will be detoured during construction.

0
0
0
0
0

(3) comments

Guest

If the State is paying for replacement of the seawall, does that mean it is public property?

Guest

Rt 146 is a state road

Guest

The wall protects the road. The road is owned by the state. The beaches are private.

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.